New Office Airport Stuttgart (NOAS) – Good air despite high traffic volumes
The erection of the striking NOAS office building was one of the largest construction projects of the past years, taking place at Stuttgart Airport. Both main buildings with six and seven upper floors, respectively, are connected to each other and visually form the curved contour of a horizontal eight. The ventilation and air-conditioning technology is provided by 12 AHUs by robatherm. Four of those AHUs are weather-resistant and are installed on the building’s roof, as can be seen on the aerial photographs. Besides the rotation as well as plate heat exchangers for efficient heat recovery, a high-performance run-around coil system (H-KVS) is also at work.