We keep our promises.

Correct data and adherence to deadlines and promises are the foundation of a trusting and long-time business relationship. These are our benchmarks. Because we value transparency.

2 AHUs ready for a Factory Acceptance Test at the robatherm plant in Burgau, Germany.
2 AHUs ready for a Factory Acceptance Test at the robatherm plant in Burgau, Germany.

Reliable Performance and Transparent Acceptance of Results.

Upon request and before delivery, you’ll have the opportunity of having the AHUs and their performance data inspected in our factory during a Factory Acceptance Test (FAT).

Factory Acceptance Test of an AHU with a fan wall.
Factory Acceptance Test of an AHU with a fan wall.

Multiple criteria for quality assessment:

  • Mechanical strength of the casing
  • Air tightness of the casing
  • Filter-Bypass-Leckage
  • Air flow rate
  • Electrical power consumption
  • External pressure
Copyright 2024. All Rights Reserved.
You are using an outdated browser. The website may not be displayed correctly. Close